Installation of a tank farm and station pipelines in Ghana for a 192 MW CCGT unit
14.12.2021
Object: Installation of a tank farm with 13 fuel and water storage tanks, incl. 2х30.000 cubic meters, 2х7.500 cubic meters, 3х4.500 cubic meters, 2х3.000 cubic meters, 2х1.000 cubic meters, 2х500 cubic meters with aluminum roofs and pontoons. Works included installation, hydraulic testing and painting.
Manufacturing and installation of BOP piping with a total volume of about 25,000 welding inches.
Category
Installation of technological equipment and pipelines
Customer
MYTILINEOS GROUP
Location
Aboadze, Republic of Ghana, West Africa
Started
2017-2019
Status
Completed